Advertisement

Rfi

Your blog talks about Rfi? Contact Us to be indexed in the BitFeed Network

Advertisement

Station Cantello-Gaggiolo, 450 thousand euro to build a new parking

An appropriation of 450,000 euros to build an interchange parking at the station Cantello Gaggiolo. It provides a resolution approved by the regional Council on the proposal of the councillor for Infrastructure, Transport and sustainable Mobility, Claudia Maria Terzi. “It is planned to build 74 parking...

After the landslide of Maccagno, mayor Rigazzi: “The streets of the Alto Varesotto firm 40 years ago”

“I have read your articles on the landslide of Maccagno, and all I do is share fully, across the board, as stated by the auditors Fabio Passera, and Andrea Pellicini“. With these words, the first citizen of Cremenaga, Domenico Rigazzi, intervenes at the margin of the tragedy touched in Maccagno and Pino...

Advertisement

Landslide Maccagno, Pellicini: “After the festive season, meeting with the Prefect and the mayors”

After the landslide occurred on Thursday night, along the SS394, between Luino and Maccagno with Pino and Veddasca, in the afternoon, the mayor of Luino, Andrea Pellicini, he had written to the Prefect of Varese, the dr. Henry Ricci, reiterating the urgent need to resume the project of the railway tunnel...

Landslide Luino-Maccagno, by this afternoon it's back to normal in road and rail

After the night passed without any landslides, despite the freezing cold and the thermal shock has put a strain on the rock already under stress, the engineers, the geologists, the fire brigade and the forces of law and order, together with the directors of Maccagno with Pino and Veddasca, are back on...

Landslide Luino-Maccagno, back to normal, the circulation in road and rail

After the night passed without any landslides, despite the freezing cold and the thermal shock has put a strain on the rock already under stress, the engineers, the geologists, the fire brigade and the forces of law and order, together with the directors of Maccagno with Pino and Veddasca, are back on...

Landslide Luino-Maccagno, back to normal movement on the state highway and railway

After the night passed without any landslides, despite the freezing cold and the thermal shock has put a strain on the rock already under stress, the engineers, the geologists, the fire brigade and the forces of law and order, together with the directors of Maccagno with Pino and Veddasca, are back on...

Landslide Luino-Maccagno, back to regulate the circulation on the highway. Stop the railway line

(UPDATE 16.30) After the night passed without any landslides, despite the freezing cold and the thermal shock has put a strain on the rock already under stress, the engineers, the geologists, the fire brigade and the forces of law and order, together with the directors of Maccagno with Pino and Veddasca,...

Landslide between Luino and Maccagno, the pedestrian passage for this evening. Tomorrow the re-opening

(UPDATE 18 HOURS) lasted for eight hours work along the side of the mountain affected last night by the landslide fall between Colmegna and Maccagno with Pino and Veddasca. The rock, Luca and Fabio Rigamonti, arrived from Lecco this morning, assisted by geologists Christian Adamoli, and Fabio Meloni,...

Landslide between Luino and Maccagno, up to 20 only pedestrian passage. Tomorrow the re-opening

(UPDATE 18 HOURS) lasted for eight hours work along the side of the mountain affected last night by the landslide fall between Colmegna and Maccagno with Pino and Veddasca. The rock, Luca and Fabio Rigamonti, arrived from Lecco this morning, assisted by geologists Christian Adamoli, and Fabio Meloni,...

Landslide in Maccagno, Pellicini: “the Urgent resumption of the project of the railway tunnel for the goods”

After landslide falling last night, along the SS394, between Luino and Maccagno with Pine and Veddascsa, this morning the mayor of Luino, Andrea Pellicini, has written to the Prefect of Varese, the dr. Henry Ricci, reiterating the urgent need to resume the project of the railway tunnel for freight trains,...

Changing the time on the Luino-Gallarate, confirmed the reductions of the rides

Was held yesterday in Milan, the meeting between the Lombardy Region, represented by Claudia Maria Terzi, department of Infrastructure, transport and sustainable mobility, Trenord, RFI, the commuters of the Dial to the West and some local administrators, including the department of the Traporti of Luino,...

The time change also on the Luino-Milan, confirmed the reductions of the rides

Was held yesterday in Milan, the meeting between the Lombardy Region, represented by Claudia Maria Terzi, department of Infrastructure, transport and sustainable mobility, Trenord, RFI, the commuters of the Dial to the West and some local administrators, including the department of the Traporti of Luino,...

If Trenord, “Full emergency, with delays, cancellations and breakdowns”. Today's hearing in the Region

The Commission Territory, presided over by Angelo Palumbo (Forza Italia), has approved today with the votes of the majority of the centre-right a proposal for a Resolution on the regional railway service, and Trenord. The discussion and voting of the proposed Resolution took place after that in the morning...